Thomas Telford is the knowledge business of the Institution of Civil Engineers
Home Register Search Tell a friend Help / Info Contact
Your Basket Your Shopping Basket (0 items)
 Advanced Search
 Site Map

Book Categories
Building Design
Computational Engineering
Earthquake Engineering
Eurocode Guides
Geospatial Engineering
Ground Engineering
Health and Safety
Innovation and Research
Law and Contracts
Municipal, Community, Urban and Rural
Professional Development
Quality Systems
Structural Materials
Structures and Buildings
Waste Management
Water and Wastewater

2017 Catalogue
2360034 kb 2018 New Books Catalogue
500933 kb Built Environment and Transport
596451 kb Construction Process and Project Management
469588 kb Eurocodes Guides
513850 kb Geotechnical and Environmental Engineering
406614 kb NEC4 Books
731994 kb Structures and Buildings
503813 kb Water and Coastal Engineering
444057 kb Engineering History
462159 kb ICEP Bestsellers

Product details

NEC4: Engineering and Construction Contract Option F: management contract


Price: £ 45.00

ISBN: 9780727763167
Format: Limp Cover
Publish Date: 21/06/2017
Publisher: ICE Publishing
Page Size: 297x210mm
Number of Pages: 88

NEC4: Engineering and Construction Contract Option F: management contract


New NEC4 Contract launched June 2017


Core Clauses
1 General
2 The Contractor’s main responsibilities
3 Time
4 Quality management
5 Payment
6 Compensation events
7 Title
8 Liabilities and insurance
9 Termination
Resolving and Avoiding Disputes
Option W1
Option W2
Option W3
Secondary Option Clauses
Option X2: Changes in the law
Option X4: Ultimate holding company guarantee
Option X5: Sectional Completion
Option X6: Bonus for early Completion
Option X7: Delay damages
Option X8: Undertakings to the Client or Others
Option X9: Transfer of rights
Option X10: Information modelling
Option X11: Termination by the Client
Option X12: Multiparty collaboration (not used with Option X20)
Option X13: Performance bond
Option X14: Advanced payment to the Contractor
Option X15: The Contractor’s design
Option X17: Low performance damages
Option X18: Limitation of liability
Option X20: Key Performance Indicators (not used with Option X12)
Option X21: Whole life cost
Options X1, X3, X16, X19 and X22 are not used Option Y(UK)1: Project Bank Account
Option Y(UK)2: The Housing Grants, Construction and Regeneration Act 1996
Option Y(UK)3: The Contracts (Rights of Third Parties) Act 1999
Option Z: Additional conditions of contract

Contract Data
Part one – Data provided by the Client
Part two – Data provided by the Contractor


Back Return to previous page

Customer Login
Email address
 Password Assistance
 Not registered?

Related Titles

NEC4: The Role of the Project Manager

NEC4: The Role of the Supervisor

NEC4 Practical Solutions

CSIC set